Web directory, archive
Search web-archive-uk.com:

Find domain in archive system:
web-archive-uk.com » UK » A » AL-LIFTS.CO.UK

Total: 52

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".
  • Works Archives - Amalgamated Lifts Amalgamated Lifts
    them on planned maintenance visits but they can fail in between servicing View by lifts admin on 9th October 2013 We gain maintenance contract at London Borough Of Enfield The London Borough of Enfield has awarded Amalgamated Lifts with a 2 year maintenance contract The comprehensive contract will require monthly planned maintenance visits carried out across the Passengers Goods and Disabled Lifts View by lifts admin on 5th August 2013

    Original URL path: http://www.al-lifts.co.uk/category/news/works/ (2016-02-15)
    Open archived version from archive

  • Thank you We have received your e mail and we ll get back to you shortly

    Original URL path: http://www.al-lifts.co.uk/wp-content/themes/al-lifts/mail.php (2016-02-15)
    Open archived version from archive

  • News Archives - Amalgamated Lifts Amalgamated Lifts
    new bottom drum drive lift within this Oxford Street building The drum drive lift was selected to maximise car space within the existing small shaft A benefit to the many businesses located within the building The 6 Read More View by lifts admin on 3rd November 2015 Bedford Street Amalgamated Lifts Limited installed a new Traction MRL Lift within a luxury Covent Garden residence The five floor single entry glass lift also benefits from penthouse priority control The traction drive Machine Room Less MRL lift offers its users a smooth Read More View by lifts admin on 25th August 2015 Introducing Alan Woollcott Alan Woollcott has been appointed Project Manager and has joined the growing Construction Department Alan brings a wealth of knowledge and experience having managed and completed successful high profile and large lift modernisation projects His projects have included blue chip Read More View by lifts admin on 25th August 2015 New Modernisation at Biscuit Building Hidden to the rear of the Tea Building the Biscuit Building in Shoreditch is home to Mother London and our latest modernisation We are currently modernising a duplex set of lifts that are found in the main entrance foyer Mother Read More View by lifts admin on 25th August 2015 Amalgamated Secures University of Brighton Contract Brighton University has selected Amalgamated Lifts Limited to carry out reactive and preventative maintenance services to 63 lifts across the University s student accommodation sites and campuses The comprehensive contract will require monthly planned maintenance visits callout and repair services as Read More View by lifts admin on 25th August 2015 CBRE Triplex Lift Refurbishment The 12 week project saw the 9 floor Triplex Lifts get new TFT clear view indicators new control panel with an Absolute Shaft Encoder ABS re skinned lift car walls new

    Original URL path: http://www.al-lifts.co.uk/category/news/ (2016-02-15)
    Open archived version from archive

  • Bespoke Machine Room-Less Lift - Amalgamated Lifts Amalgamated Lifts
    have a machine room where the motor is positioned above or below the lift shaft In this instance the client chose to have the motor installed within the lift shaft which meant they could utilise the motor room space Other advantages of MRL include Multiple entrances Operation on a Single phase supply energy efficient Installed with a limited pit depth and headroom clearance Contact Daniel al lifts co uk for

    Original URL path: http://www.al-lifts.co.uk/bespoke-machine-room-less-lift/ (2016-02-15)
    Open archived version from archive

  • We complete another prestigious project - Amalgamated Lifts Amalgamated Lifts
    with the onsite architects to design a glass shaft to encase the previous 1930 s steel and mesh works Mesh is no longer safe under new Health and Safety Laws but the client wanted to keep both the original mesh and steel works in order to create a rustic timely look within the apartment The glass enabled this to be achieved The interior is just as impressive as the glass shaft with concealed lighting inside the car and mosaic tiled flooring by Bisazza Due to space restrictions we needed to ensure all components were measured and carefully selected in order to fit perfectly We used swing landing and busmatic doors and even built a motor room on the roof to cater to the space restrictions The motor room has been encased and sheltered from all types of weathers This lift travels between 5 floors and has even got its own designed sweep dialling indicator courtesy of our Project Designer This project like all modernisation projects underwent various surveys and site assessments prior to planning and any works commencing If you would like further information on this project or would like to enquire about your own Lift designs and requirements please

    Original URL path: http://www.al-lifts.co.uk/complete-another-prestigious-project/ (2016-02-15)
    Open archived version from archive

  • INSIGHT: AUTODIALLER - Amalgamated Lifts Amalgamated Lifts
    requires that the emergency autodial system in a lift car is monitored and tested a minimum of every 3 days This includes the testing of the telephone line the back up battery and operation of the autodial unit We have researched the market and are extremely pleased to offer to supply and fit a new auto dial system that not only self checks every 3 days but checks every 24

    Original URL path: http://www.al-lifts.co.uk/insight-autodialler/ (2016-02-15)
    Open archived version from archive

  • We gain maintenance contract at London Borough Of Enfield - Amalgamated Lifts Amalgamated Lifts
    out across the Passengers Goods and Disabled Lifts AL will maintain 45 lifts at a number of sites across the borough which includes Enfield s Civic Centre Community House Office and Edmonton Green Centre The contract has designated engineers who will predominately carry out all servicing and call outs and a designated Customer Service Adviser to support the engineer and work with the Enfield Borough team In the event that

    Original URL path: http://www.al-lifts.co.uk/gain-maintenance-contract-london-borough-enfield/ (2016-02-15)
    Open archived version from archive

  • Essential maintenance upgrades at the V&A - Amalgamated Lifts Amalgamated Lifts
    Amalgamated Lifts were awarded the repairs contract by consultants Dunbar and Boardman on behalf of Cofely UK in February The 7 week project saw the upgrade of 15 hydraulic passenger lifts within the museum The shaft lighting pit ladder emergency communication and machine guarding were all upgraded Two main hoisting machines were also completely replaced AL had many factors to consider at the beginning of the project these included keeping disruption to a minimum in a fully functional museum and transporting old and new equipment to and from the motor room The equipment had to be raised and lowered through the lift shaft while a passenger lift was suspended on the 2nd floor The old Express belt driven machine was dismantled and lowered through the lift shaft exited at the second floor and transported to the basement by another lift Risk assessments were carried out before the works began to ensure the old and new equipment were transported safely and efficiently Amalgamated Lifts have been maintaining all 24 Lifts at the Victoria Albert Museum since 2010 along with 3 Lifts at Victoria Albert s Bethnal Green Museum of Childhood Tags Installation Lifts Modernisation Servicing Categories Contract Projects Installation Lift Consultants

    Original URL path: http://www.al-lifts.co.uk/essential-maintenance-upgrades-va/ (2016-02-15)
    Open archived version from archive

web-archive-uk.com, 2016-10-26