web-archive-uk.com


Web directory, archive
Search web-archive-uk.com:


Find domain in archive system:
web-archive-uk.com » UK » F » FWT.CO.UK

Total: 44

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".
  • DLR Car Diagram
    for alternative designs to evaluate all seven submitted designs conformed to standard supposed wisdom Mark speak to me about alt keys three designs selected by client to test against existing usability testing carried out in collaboration with Essex University unequivocal results showed all three FWT designs significantly out performed existing clearest geometric match to network geography and service pattern produced best scores selected design subtlety refined and then implemented platform

    Original URL path: http://www.fwt.co.uk/casestudies/dlr-car-diagram/ (2016-02-16)
    Open archived version from archive


  • Derby Bus Station
    and set down to be absorbed into main streets outside no site available for a central information point each of about 30 street bus stops to act as a temporary bus station design and implementation of wayfinding and timetable information for de centralized temporary bus station including supply of street furniture management of passenger transfer from old bus station into city centre streets design and implementation of wayfinding and timetable

    Original URL path: http://www.fwt.co.uk/casestudies/derby-bus-station/ (2016-02-16)
    Open archived version from archive

  • Norwich City Centre
    Diagrams Timetables Mapping Data Print OUR PEOPLE OUR PRINCIPLES CASE STUDIES NEWS CONTACT US Norwich City Centre Better Bus Area fund background Audit analysis design and production rollout Project management Special needs and operator consultation and collaboration Special needs Learning Guide devised and produced Partnership successes CASE STUDIES AND DOWNLOADS Norwich case study Next Case Study LATEST NEWS GTR Builds on the Success of First Capital Connect Read more CONTACT

    Original URL path: http://www.fwt.co.uk/casestudies/norwich-city-centre/ (2016-02-16)
    Open archived version from archive


  • London Underground
    PEOPLE OUR PRINCIPLES CASE STUDIES NEWS CONTACT US London Underground Client dissatisfaction with geometry and usability investigation into practicality of depicting interchange quality investigation into practicality of depicting service patterns investigation into larger typesize and layout for pocket version report on fundamental design principles and fitness for purpose CASE STUDIES AND DOWNLOADS Download the London Underground Case Study Next Case Study LATEST NEWS GTR Builds on the Success of First

    Original URL path: http://www.fwt.co.uk/casestudies/london-underground/ (2016-02-16)
    Open archived version from archive

  • Leicester City Centre
    into new roads under construction phased publicity campaign across about 85 city centre bus stops and two disparate bus stations design of new modular bus shelter flags and stop specific timetables for all stops affected by the move over a distance of about a quarter of a mile slice of later anti congestion funding spent on major upgrade to the rest of the city centre bus stops enhancement to include

    Original URL path: http://www.fwt.co.uk/casestudies/leicester-city-centre/ (2016-02-16)
    Open archived version from archive

  • Northern Rail
    Rail Station Vicinity poster evaluation production and implementation combination of two rail franchises client desire for better onward travel information analysis of station exit passenger numbers organization of local facility surveys and production of map roll out programme consultation on map scales and appropriateness for two categories of station usage explanation of scale difference cause and effect illustrated CASE STUDIES AND DOWNLOADS Download the Northern Rail Case Study Next Case

    Original URL path: http://www.fwt.co.uk/casestudies/northern-rail/ (2016-02-16)
    Open archived version from archive

  • CASE STUDIES
    CENTRE READ MORE NORTHERN RAIL STATION VICINITY POSTERS READ MORE DLR Car Diagram FWT won tender based on proven subject knowledge and expertise record brief Read More Derby Bus Station 1930s bus station to be demolished within five weeks new development on the Read More Leicester City Centre Reversal of one way traffic flows causing significant re location of about 12 bus Read More London Underground Client dissatisfaction with geometry

    Original URL path: http://www.fwt.co.uk/case-studies/page/2/ (2016-02-16)
    Open archived version from archive

  • GTR Builds on the Success of First Capital Connect
    a wealth of experience in transport mapping but also a willingness to experiment and innovate The resulting maps for GTR and its sub brands will form a key part in our customer communications for the UK s biggest passenger railway Mark Jansen Customer Information Manager GTR With the operations of Great Northern Thameslink Gatwick Express and Southern now under the overall management of Govia branded Govia Thameslink Railway GTR we were delighted when they approached us to produce their wide range of network diagrams Working closely with such an open minded and co operative client was a true pleasure and they were very willing to take on new ideas that departed very successfully it seems from some often unquestioned and inappropriate design ideals The brief included variants for all four brands as well as individual ones and all with the ability to display disabled access and staffing levels at the flick of a switch This coupled with colour coded service pattern details made for an interesting challenge Users of Southern will be aware that it has complex train services We believe the geographical shape of any network coupled with its general service pattern features must be reflected in the visuality

    Original URL path: http://www.fwt.co.uk/news/gtr-builds-on-the-success-of-first-capital-connect/ (2016-02-16)
    Open archived version from archive



  •  


web-archive-uk.com, 2017-12-16