web-archive-uk.com


Web directory, archive
Search web-archive-uk.com:


Find domain in archive system:
web-archive-uk.com » UK » J » JNPGROUP.CO.UK

Total: 172

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".
  • jnpgroup has set up a national Geo-environmental consulting arm.
    steel and glulam framed two storey building comprises civic offices a council chamber a community hall general offices and conference rooms Foundation design Structural steelwork Glulam timber RC lift pit Foul and surface water design Roads and pavings Geo environmental advice Read More JNP Group has set up a national geo environmental consulting arm to undertake all aspects of greenfield and contaminated land site investigation In pursuit of providing an overall one stop shop service to our clients JNP Group consulting engineers set up a national Geo environmental consulting arm in January 2005 The section is based out of the Midlands office and is managed by the very able Jeff Mosforth Principal Geotechnical Engineer and Hilary Ilsley Principal Geo environmental Engineer A nationwide service is easily provided from this central location The section undertakes all aspects of greenfield and contaminated land site investigation from pre acquisition feasibility studies Geo environmental site investigations and ground remediation and improvement for both large and small residential and commercial redevelopment projects Their work is increasingly well received by our clients throughout the UK In feedback clients have expressed the advantages of the synergy between geo environmental and the civil Transport and structural engineering sections

    Original URL path: http://www.jnpgroup.co.uk/news/geo_env.php (2016-02-11)
    Open archived version from archive


  • jnpgroup consulting engineers successfully building partnerships with local authorities in West Yorkshire.
    offices and conference rooms Foundation design Structural steelwork Glulam timber RC lift pit Foul and surface water design Roads and pavings Geo environmental advice Read More The JNP Group consulting engineers offices in Brighouse and Sheffield have been particularly successful in building a constructive working relationship with local authorities in West Yorkshire The initial success was in winning a Partnering Agreement with Calderdale Council to carry out the Building Regulation calculation checking function and providing a Dangerous Structures service Calderdale like many other local authorities had disbanded their structural engineering section and the Council had sought two partnering agreements One for the function just described and a second one for a design services which was intended to encompass all the project consultancy services that the Council may require on building projects such as building surveying architecture M E engineering and structural engineering services The second partnering agreement was awarded to a large international consultancy In the event the local position of the Brighouse office it is in the Calderdale Borough and the more personal and immediate service that JNP Group consulting engineers could offer proved very attractive to the various council departments and the structural engineering services that JNP have offered Calderdale has grown to encompass many public projects including the refurbishment and extension of schools and other council buildings as well as assisting with the redevelopment of public facilities such as a new open market in Sowerby Bridge The Yorkshire offices have also been successful in being placed on framework agreements for the provision of civil and structural services with both Bradford MDC and Kirklees Council The Brighouse and Sheffield offices have provided structural engineering services for the redevelopment of eight junior and infant schools in Bradford as part of the Government s Sure Start Programme in particular as

    Original URL path: http://www.jnpgroup.co.uk/news/northern_partnering.php (2016-02-11)
    Open archived version from archive

  • jnpgroup consulting engineers are increasingly involved at the pre-planning and planning stage
    2013 Planning issues Sustainable houses Teesside or seaside Wind Farm Civil Engineering Services Latest Case Study This 1800m2 structural steel and glulam framed two storey building comprises civic offices a council chamber a community hall general offices and conference rooms Foundation design Structural steelwork Glulam timber RC lift pit Foul and surface water design Roads and pavings Geo environmental advice Read More As from August 1st 2013 the Leamington Spa

    Original URL path: http://www.jnpgroup.co.uk/news/jnpstructure.php (2016-02-11)
    Open archived version from archive


  • jnpgroup consulting engineers are increasingly involved at the pre-planning and planning stage
    offices a council chamber a community hall general offices and conference rooms Foundation design Structural steelwork Glulam timber RC lift pit Foul and surface water design Roads and pavings Geo environmental advice Read More Manual for Streets 2 Could it help you gain Planning Manual for Streets 2 2010 Manual for Streets 2 Wider Application of the Principles was published by the CIHT in September 2010 It does not supersede MfS1 but extends the principles of MfS1 to busier streets and non trunk roads thus bridging the gap between MfS and the Design Manual for Road and Bridges DMRB Key Points The strict application of DMRB is rarely appropriate for highways in built up areas as it mainly focuses on vehicular Transport whilst more or less ignoring other street users MfS2 encourages designers to use their professional judgement and take into account the local contact rather than over relying on strict guidance The above should go hand in hand with the hierarchical approach taking into account the needs of pedestrians and cyclists first in order to promote sustainable travel modes by design De cluttering the use of street furniture should be well considered and only those elements that serve a clear function should be introduced to minimise visual intrusion and facilitate pedestrian movement The amount of road signing and lining should be kept at the necessary minimum ensuring no detrimental impact on road safety Road Safety Audit RSA should form part of the overarching Quality Assessment and be accompanied by a Risk Assessment CIHT Road Safety Audit Guidelines 2008 should be used alongside the DMRB Road Safety Audit guidance The way visibility splays are determined has been revised and can be now applied to a wider range of situations although DMRB values are still promoted for roads with recorded design

    Original URL path: http://www.jnpgroup.co.uk/news/manual2.php (2016-02-11)
    Open archived version from archive

  • jnpgroup consulting engineers are increasingly involved at the pre-planning and planning stage
    RC lift pit Foul and surface water design Roads and pavings Geo environmental advice Read More JNP Group Consulting Engineers at MIPIM 2013 Multi disciplinary Consulting Engineers jnpgroup are proud to be actively taking part in MIPIM 2013 At the event we will be represented by Group Chairman Andrew Lee and Senior Associate Tony Davies Both Andrew and Tony will be delighted to meet clients old and new at any of the many venues both in and out of the Conference Centre Andrew and Tony are hoping to meet investors developers and contractors who may wish to take advantage of our proven track record in providing innovative cost effective engineering advice and design services for well in excess of 30 years The practice has achieved a growing reputation for its professional practical and commercial approach to advice and design within the construction industry We operate a cradle to the grave consultancy service ranging from initial pre purchase advice right up to project management and supervision of the product during construction if required The quality of our work was also recognised by our Trade Association the ACE as we were ACE Consultant of the Year finalist in 2011 A key part of our success we put down to active partner involvement in all aspects of the design and consultancy process All projects are directly overseen by one of the Managing Partners located in each of the five offices throughout the Group Our skill sets cover a wide range of client sectors ranging from housing to rail to heavy industry and the renewable sector specifically including wind farms On the project planning side we are also able to assist at the outline and detailed planning process where we provide Geo environmental Assessments Flood Risk Assessments Drainage Strategies Transport Assessments and Travel Plans

    Original URL path: http://www.jnpgroup.co.uk/news/MIPIM.php (2016-02-11)
    Open archived version from archive

  • jnpgroup consulting engineers are increasingly involved at the pre-planning and planning stage
    the Regulatory Authorities at the pre planning and planning stage In particular we have found that over recent years two items in particular are now more or less required on all new developments these being a Transport assessment and a flood risk assessment In the following resumes Alan Brackley member responsible for Transport assessments highlights the issues involved and Peter Hurd Member responsible for flood studies considers aspects of this together with the current stance of the Environment Agency Transport Assessments Essential and Local Government policy on the environment Transport impact and sustainability are driving the need for full pre planning and planning assessments as part of the planning process Alan Brackley reports significant increase in the demand for these services from clients for developments ranging from anything from one additional property but more typically for developments of 20 to 1000 plus properties JNP Group consulting engineers have developed a full range of skills to provide the answers to all issues raised by the planning process The following list is typical of the topics which must be considered Sustainability Pedestrian routes Safe cycling routes Safe routes to schools Public transport studies Bus links Accident statistics Proposed junction modelling Speed surveys and access arrangements Integrated transport policy JNP Group consulting engineers have the full range of software for design of roundabouts Transport signals T junctions cross roads and are subscribers to the TRICS database for accurately and instantly assessing the likely Transport generation of proposed and present uses of development sites Flooding assessments Flooding is never far from the news To some developers the effect of global warming appears to be yet another problem to overcome at the planning stage Peter Hurd Member at jnp group Chesham reports that the Environment Agency s request for flood risk assessments is becoming common

    Original URL path: http://www.jnpgroup.co.uk/news/planning.php (2016-02-11)
    Open archived version from archive

  • JNP Group Consulting Engineers | News | A soultion to growing concerns on the economy and the housing market
    JNP Group s designs for a future with reduced carbon emissions less dependency on mains services and a sustainable lifestyle have been built in Northampton and promise a greener future and more stable house prices House prices have dropped as much as 8 nationally since the credit crunch and mortgage famine This has spelt doom for many builders and people wanting to sell or buy a home Houses built with sustainability in mind are an answer to price instability carbon emissions and flood risk claim JNP Group JNP Group s designs commissioned by Barratt Northampton are now reality and with an emphasis on reducing carbon emissions and dependency on mains water they are environmentally sound and being lower cost to run likely to retain their value when other houses drop in price JNP Group partner Andrew Lee commented We were commissioned to design houses that met government targets for carbon emissions so we planned homes that are energy and water efficient use renewable energy where possible and minimised waste Recent increases in gas and electricity prices make these homes very desirable We have also designed them to capture solar energy via photovoltaic systems and solar water heating systems Coupled with very effective insulation this means they are much cheaper to run than the more traditional home He continued Climate change and in particular last year s floods have made planners and builders think about how modern house design can be used to prevent disasters The houses we designed for Barratt Northampton at Upton took all this into consideration and were built before last years floods We designed some of the houses with green roofs These are built with plants like sedum growing on them This slows the flow of water and prevents flash floods On other roofs we harvest rainwater

    Original URL path: http://www.jnpgroup.co.uk/news/houses.php (2016-02-11)
    Open archived version from archive

  • jnpgroup opens 6th office in Hartlepool.
    Group partnering JNP Group streamline company structure Manual for Streets 2 MIPIM 2013 Planning issues Sustainable houses Teesside or seaside Wind Farm Civil Engineering Services Latest Case Study This 1800m2 structural steel and glulam framed two storey building comprises civic offices a council chamber a community hall general offices and conference rooms Foundation design Structural steelwork Glulam timber RC lift pit Foul and surface water design Roads and pavings Geo

    Original URL path: http://www.jnpgroup.co.uk/news/6office.php (2016-02-11)
    Open archived version from archive



  •  


web-archive-uk.com, 2017-12-14