  • Luddon Construction
    polypropylene fibre reinforced concrete including all drainage and service ducting concrete channels lids Formation of bunded storage tank area consisting of approximately 366m of 2 5m high in situ reinforced concrete walls 7no reinforced concrete tank bases 17m and 25m dia approximately 3000m³ concrete Construction of 18m high steel framed process building and laboratory office facility 1800m² designed and built to withstand blast loadings from adjacent MOD armaments depot Construction

    Original URL path: http://www.luddon.co.uk/projects/case-studies/barkip-anaerobic-digestion-plant/ (2016-04-26)
    Open archived version from archive


  • Luddon Construction
    new building platform for future housing Placement of approximately 35000t of imported stone New filter drains varying diameters from 150mm Dia 600mm Dia Installation of kerbing road gullies and manholes Construction of a new 750 metre section of carriageway and footpath to adoptable standard including asphalt surfacing and road markings Utilities diversions Scottish Power overhead cables had to be relocated underground Water main and telecom cabling had to be diverted

    Original URL path: http://www.luddon.co.uk/projects/case-studies/bishopbriggs-relief-road/ (2016-04-26)
    Open archived version from archive

  • Luddon Construction
    challenging due to location 30 000m³ cut and fill of new carriageway route Retention of sloped areas by installation of over 500 soil nails 6 metres long and a combination of grout stabilisation gabion baskets and reinforced concrete wing walls to the railway bridge Lowering of existing carriageway beneath existing railway bridge incorporating permanent reinforced concrete structures and increased capacity drainage Protection of watercourse including pollution measures Removing Japanese knotweed

    Original URL path: http://www.luddon.co.uk/projects/case-studies/griffin-windfarm-road-reconfiguration/ (2016-04-26)
    Open archived version from archive


  • Luddon Construction
    Works Included Deep drainage including construction of a concrete headwall with outfall into the River Clyde Service installations including diversions of various existing utilities and street lighting Construction of 50 metres of gabion walling Kerb realignment including construction of new section of carriageway 450 metres Upgrade of existing carriageway surface and a further 200 metres of new surface Soft landscaping package Fencing package Similar Projects and Case Studies Bishopbriggs Relief

    Original URL path: http://www.luddon.co.uk/projects/case-studies/downiebrae-road/ (2016-04-26)
    Open archived version from archive

  • Luddon Construction
    construction of 50 000 litre capacity reinforced concrete water tank Installation of 110 000 litre capacity petrol separator and new chemical waste tank Breaking out approx 100m³ rock to provide access to lochside for installation of Raw Water intake equipment Excavation through rock of over 500m of track 1 1m deep and laying of pipework and ducting for comms cabling etc Installation of new ductile and HDPE Barrier Pipe including

    Original URL path: http://www.luddon.co.uk/projects/case-studies/loch-katrine-water-treatment-works/ (2016-04-26)
    Open archived version from archive

  • Luddon Construction
    effective ground engineering solution to be arrived at Full process and mechanical and electrical detailed design Piling works Gas protection measures Gas tight concrete construction to fermentation tanks Construction of reception hall with all associated drainage and process pipework Construction of aerobic composting bays Supply and installation of shredder and screening equipment in dedicated area of building Construction of pasteurisation tunnels Extensive external and internal drainage works including SEPA approved SUDS measures Installation of service track from new installation to energy compound including new gas and water mains and various duct banks Erection of bunded fuel station for all operational plant Structural steel and cladding for building around various process areas including rigorous corrosion protection measures due to the extremely corrosive nature of the internal atmosphere of the building Full mechanical and electrical installation both internal and external to the building including sophisticated gas extraction system and patented composting technologies Erection of standalone office complex including main plant room for complete works Construction of new Scottish Power substation with associated ducting Construction of large leca media bio filter complete with 18m exhaust stack Cold and hot commissioning of the plant including training of Fife Council staff during commissioning period Achieving

    Original URL path: http://www.luddon.co.uk/projects/case-studies/lochhead-biowaste-plant/ (2016-04-26)
    Open archived version from archive

  • Luddon Construction
    slabs plinths and finishes and cast in items Lighting protection tabs Dpc dpm membranes tanking Drainage and services Brickwork blockwork Precast concrete slabs stairs and pitched roofs Concrete superstructure reinforced concrete frame buildings and all temporary works Dewatering Roads car parks including Roundabout Junctions Pavements Earthworks Retained structures General builders work Drainage Two SUD s ponds Drainage outfall into the River Clyde inc a 1 1m cast iron flap valve

    Original URL path: http://www.luddon.co.uk/projects/case-studies/strathclyde-fire-and-rescue/ (2016-04-26)
    Open archived version from archive

  • Luddon Construction
    structure within the Monkland Canal at Summerlee Heritage Museum Works Included Construction of a concrete and steel support structure within the Monkland canal at the Summerlee Heritage Museum to support the restored Vulcan canal boat Procure crane prepare lifting area to crane supplier s requirements and carry out the lift to place the canal boat into position Fit new galvanised access gangways Installation of power supply to the boat Photo

    Original URL path: http://www.luddon.co.uk/projects/case-studies/vulcan-restoration/ (2016-04-26)