  • Luddon Construction
    operations Co ordination of and with piling operations Making safe working areas by site scanning and trenching Deep excavations through live plant situations New foundations for pumps vessels and towers Construction of Reinforced concrete hardstandings and reinforced concrete bunds Co ordination of and with structural steel works New and alterations to drainage Similar Projects and Case Studies Amistar AZ3 Chemical Plant Refurbishment Bio Ethanol Plant Enhanced Gas Separation Project Lochhead

    Original URL path: http://www.luddon.co.uk/projects/case-studies/kg-flex-project/ (2016-04-26)
    Open archived version from archive


  • Luddon Construction
    Included Reinforced concrete bund walls Reinforced concrete tank foundations Lining of bund and stone fill Rawmat HDP P2 liner Drainage storm water Pipeline and utilities supports Reinforced concrete building slab foundations Structural concrete Structural steel Buildings Stairs Pipe Supports Cladding to steelwork Road Works Concrete Gravel Similar Projects and Case Studies Amistar AZ3 Chemical Plant Refurbishment KG Flex Project Enhanced Gas Separation Project Barkip Anaerobic Digestion Plant Lochhead Biowaste Plant

    Original URL path: http://www.luddon.co.uk/projects/case-studies/bio-ethanol-plant/ (2016-04-26)
    Open archived version from archive

  • Luddon Construction
    and slabs for new PAU s to be assembled upon Installation and construction of road modifications and temporary hardstandings to facilitate the heavy haul routes for PAU delivery Crude Oil Stabilisation KA31 Installation of 12no Mini Ishebek Piles Installation of Concrete Pilecaps and support structures Construction of New Culvert to 3rd Street Crude Oil Stabilisation KA24 Removal and disinvestment of existing buried structures including 50no existing concrete piles Removal of contaminated drainage and pipe bedding materials and reinstatement of lines Installation of 150no concrete driven piles Installation of various concrete pilecaps support structures pipe rack foundations high point paving and roads Installation of new surface water and oily water drainage systems using cement lined ductile iron concrete and vitrified clay pipes Construction of insitu concrete manholes Cooling Water Package KA24 Installation of 50no concrete driven piles Construction of cooling tower structure base 200m3 concrete plus 2 5m high concrete walls to the perimeter Installation of 20 valve and pipe feeds for cooling tower Transformers KA45 Construction of 2no transformer pens Excavation and construction of 240m service trench to feed transformers Construction of various concrete structures to take UPS buildings During the course of the works we have also installed approx

    Original URL path: http://www.luddon.co.uk/projects/case-studies/enhanced-gas-separation-project/ (2016-04-26)
    Open archived version from archive


  • Luddon Construction
    works for 400kv substation upgrade Works Included Demolition Removal of redundant equipment Removal of old helical piles Breaking out old concrete bases Installation of new Piles and grillages New ducting chambers and pad foundations Installation of new troughing units Earthing and bonding Similar Projects and Case Studies Loch Katrine Water Treatment Works Johnstone Sub Station Enabling Works Photo Gallery Click on image to view full screen Luddon Construction Ltd Balmore

    Original URL path: http://www.luddon.co.uk/projects/case-studies/neilston-sub-station-enabling-works/ (2016-04-26)
    Open archived version from archive

  • Luddon Construction
    areas The short construction programme was paramount to the client so some time saving construction materials were used Pre cast units Rather than sub structure masonry pre cast units were used This cut weeks off the programme and negated weather dependant activities Strux fibres High strength high modulus synthetic macro fibre which is added to ready mix concrete This replaces reinforcement mesh which led to many advantages Less preparation time

    Original URL path: http://www.luddon.co.uk/projects/case-studies/recycling-centre-blochairn/ (2016-04-26)
    Open archived version from archive

  • Luddon Construction
    Clearance Bulk excavation 9000m 3 Installation of 150mm dia drainage pipes protected with concrete cover slabs Installation of new concrete manholes Concrete kerbs 80mm permeable block paving to parking bays as part of SUDS drainage system laid on graded stone and membrane filtration system with flow control into main sewer Asphalt surfacing to access road White lining Soft landscaping and seeding Street lighting works Similar Projects and Case Studies Bathgate

    Original URL path: http://www.luddon.co.uk/projects/case-studies/linwood-point-car-park-paisley/ (2016-04-26)
    Open archived version from archive

  • Luddon Construction
    external internal openings to control building New access road into the existing substation Removal of existing concrete foundations slabs and installation of a new skid slab Capping of all drainage and services prior to demolition of the existing oil plant and LVAC building New foundations and brick piers to strengthen the existing boundary wall New access road and pedestrian access path Services installations including heating lighting small power ventilation and

    Original URL path: http://www.luddon.co.uk/projects/case-studies/johnstone-sub-station-enabling-works/ (2016-04-26)
    Open archived version from archive

  • Luddon Construction
    additional ducts Reinstatement of the public footpath It also included all necessary traffic management liaison with other parties affected by the street works and maintaining the security of and access to and from the substation building Luddon was also Principal Contractor for two other works the Client carried out at the same time asbestos removal and installation of circulatory lighting both contracts took place within the Substation Luddon redesigned the

    Original URL path: http://www.luddon.co.uk/projects/case-studies/st-andrews-cross-sub-station/ (2016-04-26)