  • Luddon Construction
    ramp and landing areas traversing the embankment and a staircase section Works Included Embankment excavation earthworks and general preparation Minipile and ground beam and pads with holding down bolts Reinforced concrete retaining walls and ramps Metal safety balustrades Electrical lighting including builders works associated with the CCTV installation External works include temporary pathways by others and minimum soft landscaping and ground re shaping works Similar Projects and Case Studies Neilston

    Original URL path: http://www.luddon.co.uk/projects/case-studies/bishopton-station/ (2016-04-26)
    Open archived version from archive


  • Luddon Construction
    multiple ramp and landing areas traversing the embankment and a staircase section Works Included Embankment excavation earthworks and general preparation Reinforced concrete retaining walls and ramps Metal safety balustrades Electrical lighting including builders works associated with the CCTV installation External works include temporary pathways by others and minimum soft landscaping and ground re shaping works Similar Projects and Case Studies Johnstone Station Car Park Neilston Park and Ride Milliken Park

    Original URL path: http://www.luddon.co.uk/projects/case-studies/cumbernauld-station/ (2016-04-26)
    Open archived version from archive

  • Luddon Construction
    monitored with Barriers at the following locations Garve Level Crossing Nigg Level Crossing Duirinish Level Crossing Bilbster Level Crossing Works Included Barrier Arm bases Road Traffic Light Bases REB Bases Signal Post Telephone Bases Signalling Cabinet Bases Plinths Pedestrian access routes Vehicle Pedestrian access gates Lineside Troughing works Timber Fencing Metal Palisade Fencing Security Pane Road Cattle Grids Under Road Crossing and Cable Ducting works Installing new Anti Trespass Guards

    Original URL path: http://www.luddon.co.uk/projects/case-studies/far-north-level-crossings/ (2016-04-26)
    Open archived version from archive


  • Luddon Construction
    to parapet details Structural steel and reinforced concrete to form ramps Precast hollowcore decking slabs with a concrete topping and proprietary waterproof finish Access stairs are structural steel framed with steel stringers treads and risers and industrial style balustrade The stair enclosing walls are metal wall panels with similar on the roof all supported on cold rolled steel rails and purlins Services are restricted to rainwater disposal electrical lighting and

    Original URL path: http://www.luddon.co.uk/projects/case-studies/johnstone-station-car-park/ (2016-04-26)
    Open archived version from archive

  • Luddon Construction
    the 275 132kV Substation Works Included Temporary fencing Excavation and formation of 450mm thick slab foundation Cast in situ reinforced concrete transformer bund 26m x 15m x 1m deep Cast in situ reinforced concrete transformer bases Trench and duct installation Installation of high frequency earth rods including CAD welding Oily water drainage systems Site reinstatement Surface chipping Similar Projects and Case Studies Johnstone Sub Station Enabling Works St Andrews Cross

    Original URL path: http://www.luddon.co.uk/projects/case-studies/new-cumnock-sub-station-civils/ (2016-04-26)
    Open archived version from archive

  • Luddon Construction
    Council Value 3 9m Contract ICE 5th Edition Project Description Road improvement works associated with a new rapid transport system Works Included Road widening Earthworks Drainage and Ducting Kerbing Surfacing Road Markings and Surface Treatments Street Lighting Signage Civils works for Traffic Signals Landscaping Similar Projects and Case Studies Downiebrae Road Bishopbriggs Relief Road Photo Gallery Click on image to view full screen Luddon Construction Ltd Balmore House 1497 Balmore

    Original URL path: http://www.luddon.co.uk/projects/case-studies/fastlink-core-route-contract-5-5b-5c/ (2016-04-26)
    Open archived version from archive

  • Luddon Construction
    ground conditions and the client s site investigation identified that the area in question had a high water table which would make drainage installation problematic particularly when it was necessary for the drainage to be designed at depths of up to 5 metres in areas Stabilisation of the ground was proposed by the client as an option within their tender documents although this element of the project was to be awarded on a design and build basis to achieve the clients specification of 15 CBR at the top of capping and settlement criteria of 25mm Following thorough analysis of options during the tender process to ascertain the best stabilisation method for the site Luddon proposed mass in situ soil stabilisation This was proved to be the most cost effective and overall best technical solution The stabilisation method formed a critical part of the overall works since the stabilised ground enabled the drainage to be installed quicker safer without the need for de watering The ability to work in all weathers whilst carrying out the stabilisation process also provided Luddon with the confidence that we could meet our client s tight deadline for the provision of access to the new school

    Original URL path: http://www.luddon.co.uk/projects/case-studies/newton-farm-phase-2-cambuslang/ (2016-04-26)
    Open archived version from archive

  • Luddon Construction
    5km of refrigerated Ethane pipeline Works Included Preparation of design calculations drawings and fabrication lists for approval by the client Fabrication erection of large lattice bridges approx 25 40m single span Fabrication erection of support legs and frames Access platform installation Goal post supports to expansion loops Handrails stairs Similar Projects and Case Studies Ethane Pipeline Civils Amistar AZ3 Chemical Plant Refurbishment KG Flex Project Enhanced Gas Separation Project Photo

    Original URL path: http://www.luddon.co.uk/projects/case-studies/ethane-pipeline-structural-steel/ (2016-04-26)