Web directory, archive
Search web-archive-uk.com:

Find domain in archive system:
web-archive-uk.com » UK » P » PLATFORMLIFTCO.CO.UK

Total: 316

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".
  • Disabled access platform lift for school classroom - Case study
    building with a new five classroom two storey building To link the junior building with the new building at different levels a platform lift would be necessary to comply with the Disability Discrimination Act DDA The lift installation needed to take into consideration the risk of children using the lift when they re not meant to and worst case scenario breaking it Solution The Internal Vertical platform lift complete with one hour fire rated shaft and battery back up was specified This free standing independent access solution can be installed with minimum disruption To ensure that only authorised passengers use the disabled access lift a School Control system was fitted The system guarantees exclusivity to its disabled users The platform lift will automatically lock after use unless it s activated by a swipe card key pad or magnetic fob Benefits By installing an independent access Internal Vertical platform lift an effective feed was created allowing students with disabilities to move seamlessly between the two buildings The School Control system has been effective in ensuring authorised access only Product Categories Platform Lifts Residential Platform Lifts Platform Lifts for Stairs Goods Lifts Passenger Lifts Useful Links Pool Lifts Trade Lifts Accreditations Recruitment

    Original URL path: http://www.platformliftco.co.uk/case-studies/education/maynard-school/ (2016-02-17)
    Open archived version from archive

  • Somerville College | Platform Lift Company
    remains the only British woman to have won a Nobel Prize for science Margaret s academic work was strong and she won several grants and prizes It was during her time at Somerville that she also became the first woman President of the Oxford University Conservative Organisation After four years as a research chemist Margaret Thatcher went on to a career in law She became the MP for Finchley in 1959 and in 1979 Britain s first and so far only female Prime Minister The Platform Lift Company was contacted through the estates department at Somerville in regards to installing a platform lift into the student s accommodation from the entrance to the bar social area this was a tricky installation as the access was a tad tight within the accommodation entrance stair area The Platform Lift needed to be a glass structure to allow as much light into the area as possible with a fire rated door at the upper level but had to be in keeping with the Bar social area design The Platform Lift Companies British style lift with its small footprint size 1330mm x 1530mm but maintaining building controls Part M 1100mm x 1400mm requirements the

    Original URL path: http://www.platformliftco.co.uk/case-studies/education/iron-lady-platform-lift-company-oxfords-somerville-college/ (2016-02-17)
    Open archived version from archive

  • Platform lift installation for disabled access to school classrooms
    vocational floors with studios rehearsal rooms a recording studio a canteen and two courtyard gardens Solution Hydraulic platform lift between floors As part of the planning and development process for the school buildings The Platform Lift Company was engaged to design and install a hydraulic platform lift between the ground and first floors As for every installation that the company completes a full site survey was carried out As well as providing all the information that the design team require the site surveyors accessed the logistical issues too From parking and access to the building through to moving the lift to the point of installation nothing was left to chance Benefit DDA compliance for school Thanks to meticulous planning the installation when smoothly and to time ensuring there were no interruptions to the day to day activities of the school This stylish platform lift blended in well with the architecture of the school and is now playing its part conveying stars of the future into the limelight The Client Sylvia Young Theatre School Established in 1981 in Drury Lane London by Sylvia Young OBE the Sylvia Young Theatre School has over thirty years experience training young people for stage and

    Original URL path: http://www.platformliftco.co.uk/case-studies/education/sylvia-young-theatre-school/ (2016-02-17)
    Open archived version from archive

  • University student disabled access through platform lift installation
    Solution Internal Platform Lift After briefing meetings with the University management team architect and main contractor B M Installations a comprehensive site survey was completed to access the most appropriate platform lift to install and to understand any access and installation challenges that might arise An A1 internal platform lift was specified by The Platform Lift Company design team to maintain maximum space within the building With no requirement for a machine room and all the control systems within the shaft this product met all of the architect s requirements and had the smallest footprint Benefits Full disabled access between floors Thanks to the meticulous survey and planning process adopted by the design and installation teams the platform lift installation went smoothly and to time Staff training was carried out by the installation team as part of the commissioning and handover process to ensure that all health and safety issues were addressed The refurbished building now offers all visitors easy access to all levels And with a support contract in place the Universities facilities team have complete peace of mind when it comes to smooth operation 24 7 The Client The University of Nottingham Product Categories Platform Lifts Residential Platform

    Original URL path: http://www.platformliftco.co.uk/case-studies/education/university-of-nottingham/ (2016-02-17)
    Open archived version from archive

  • Goods lift , dumb waiter installation for national restaurant chain
    lifts in a busy retail environment a comprehensive site survey is critical Richard Humphries surveyor at The Platform Lift Company explains We have a unique approach to ensure lift installations go in first time every time We always carry out a site survey to ensure that we can deliver the lift into the building and complete the installation to time We then prepare site specific drawings including the builders work element to make sure the installation goes to plan on the day A pair of 50kg Microlifts goods lifts were specified for each restaurant One for food complete with a car heater to keep the food warm fresh whilst in transit and the other for non food items Benefit Efficient restaurant operation Detailed surveys of each site meant that both the delivery to site and the installation went without a hitch Staff training was provided at the point that the store was handed over meaning the lifts were operational from day one ensuring the restaurants were working efficiently delivering food to each and every table as it should be perfect The Client Since the 1st restaurant opened its doors in 1992 Wagamama Restaurants have grown to more than 103 restaurants

    Original URL path: http://www.platformliftco.co.uk/case-studies/goods-type-lifts/dumb-waiter-installation-for-national-restaurant-chain/ (2016-02-17)
    Open archived version from archive

  • Victorian building disabled access for Dentist surgery - Case study
    its 2m step lift which would combat the access restrictions of the Victorian building as neither the first floor nor the basement was on a level with the pavement It was important that the DDA compliant lift remained in keeping with the surrounding architecture Benefits The Step Lift met both structural and architectural requirements The stylish contemporary designed step lift blended in with the existing architecture and eliminated the need for internal structural alterations The carriage s open look achieved by big glass safety panels and solid details in stainless steel created an elegant DDA access solution Rapid installation was achieved due to the installation friendly site assembly system for the guiding frame The machine box may be fitted to guiding frames of different lengths in order to suit a wide range of lifting heights Since installing the step lift The Butts Dental Practice has been actively marketing the fact it now has disabled access this has resulted in the practice gaining new patients The lift is constantly in use and has proved to be a real asset to the practice as well as meeting DDA standards and complying with the Machinery Directive no images were found Product Categories Platform

    Original URL path: http://www.platformliftco.co.uk/case-studies/health/butts-dental-practice/ (2016-02-17)
    Open archived version from archive

  • Contemporary DDA disabled access office platform lift - Case study
    lift was specified which is easily tailored to suit individual requirements This disabled platform lift comes as standard with an emergency battery back up switch in case of mains power failure The platform lift can travel up to 13m and was manufactured in a standard broken white finish that would suit the décor and contemporary environment A pit of 50mm was dug into the floor to provide flush level access into the lift The small pit ensures the lift does not impact on the structure of the building making it a cost effective solution Traditionally the power supply is required at the upper level Due to an existing supply already in place the lift design was modified so that it could be located on the lower level This also helped to reduce costs as the lift installation would work within the building s parameters Benefits The lift installation means the Naylors of Wakefield premises has full disabled access and is compliant with the Disability Discrimination Act Aesthetically the lift s contemporary design is in keeping with the overall architecture of the building no images were found Product Categories Platform Lifts Residential Platform Lifts Platform Lifts for Stairs Goods Lifts Passenger

    Original URL path: http://www.platformliftco.co.uk/case-studies/offices/naylors-of-wakefield/ (2016-02-17)
    Open archived version from archive

  • Bespoke platform lift residential disabled access solution
    s in house design team embarked on the creation of a unique design to complement the Candy Candy exclusive residential interior An elegant free standing solution was selected that only required fixing off the doors apertures at each floor level A further advantage of this approach was that there was no pit required to house motors or control systems The free standing shaft was powder coated and doors manufactured from stainless steel and trimmed to match the décor The platform lift floor was finished in stone to fully achieve the Candy Candy vision Benefits Seamless architectural integration The Platform Lift Company has unique experience working with some of the UK s premier architects designing and installing disabled access platform and stair lifts in the home setting Combine this with a design team well versed in creating bespoke solutions and you have the perfect combination The result the team achieved was a disabled access solution that blended perfectly with the high quality finish of this exclusive residential development and was installed with the minimum of disruption The Client Cundall One Hyde Park Established in the UK thirty five years ago Cundall is an international multi disciplinary consultancy operating from twenty one

    Original URL path: http://www.platformliftco.co.uk/case-studies/residential/platform-lift-for-exclusive-residential-development/ (2016-02-17)
    Open archived version from archive

web-archive-uk.com, 2016-10-25