Web directory, archive
Search web-archive-uk.com:

Find domain in archive system:
web-archive-uk.com » UK » T » TURNER-ACCESS.CO.UK

Total: 302

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".
  • Glasgow South Rotunda Case Study from Turner Access
    as part of the Glasgow 2014 Cultural Programme and Glasgow Commonwealth Games 2014 The South Rotunda has been a landmark of Glasgow s waterfront for over a century One of two on the River Clyde it was built in the late 19th Century as part of the original Glasgow Clyde Tunnel But closed to the public in 1980 the South Rotunda has lain unused ever since Coinciding with the Glasgow Commonwealth Games 2014 the National Theatre of Scotland decided the unique dome shaped building would be perfect to host their newest production and festival The Tin Forest Greater Versatility Turner OCTO System Scaffolding is designed for greater versatility achieved through the design of key scaffold components The Turner OCTO joint connection allows a 360 movement which can accommodate eight components in one cup at the same level This degree of versatility accommodated the circular nature of the stage and internal Rotunda walls The National Theatre Scotland Presents The Tin Forest The National Theatre Scotland Presents The Tin Forest As Glasgow welcomes the world for the Commonwealth Games 2014 The Tin Forest invites the people of Glasgow to retell the city s story and to reimagine its future The majestic South

    Original URL path: http://www.turner-access.co.uk/about-us/case-studies/glasgow-south-rotunda.aspx (2016-02-12)
    Open archived version from archive

  • The Turner Group Head Office Case Study from Turner Access
    glazed window installation security boundary fence replacement internal stairwell refurbishment external brick work and internal air conditioning servicing Internal Ventilation The scaffold structure included mesh decking used to allow adequate ventilation and temperature management of the internal air conditioning system while being serviced Without the appropriate ventilation the temperature of the air conditioning system would rise to a level that would cause a shut down A costly prospect The Turner OCTO mesh deck consisting of an aluminium box section frame with aluminium mesh insert allows air to flow freely through it which provided the needed ventilation to maintain the optimum temperature of the system Maximising Productivity The speed of the Turner OCTO System was a significant factor in the success of the project For the same scaffold area Turner OCTO uses fewer components and is less than half the weight of traditional tube and fittings and traditional system scaffolding This means a reduction in erection and dismantling time and increased speed resulting in greater productivity The Outcome The Turner Group Building has now been fully refurbished and displays a modern and innovative environment that all members of the Group can be proud of The interior styling is now in line

    Original URL path: http://www.turner-access.co.uk/about-us/case-studies/turner-group-head-office.aspx (2016-02-12)
    Open archived version from archive

  • The Deepwater Transocean Frontier Case Study
    better solution for the job Challenges Solutions Operating with scaffolding in an offshore environment is challenging due to factors such as increased safety requirements and weight restrictions Weight Turner s System is a scaffold system that has been designed to be compliant with offshore regulations namely the requirement for a triple guardrail North Sea sector safety requirement Other scaffold systems deal with this by using a number of components which adds to user handling time and increases structure weight Turner s System utilises one component In comparison studies it has been proven that for the same scaffold area Turner s System uses fewer components and is less than half the weight of traditional Tube Fittings and traditional System Scaffolding Not only does this help manage weight it also helps speed up assembly and dismantling Safety Another benefit of using Turner s System in an offshore application is the availability of a mesh deck shown in photographs below The deck consists of an aluminium box section frame with aluminium mesh insert which allows water to run freely through it therefore not interfering with the deluge system The deck also prevents wind uplift due to the mesh insert i e wind can pass freely through the deck The mesh deck has various safety features such as visual safety checks the mesh insert allows a considerable amount of visibility through the scaffold structure This can also aid assembly and dismantling procedures Additional Product Benefits Key Turner OCTO components have been designed and manufactured with safety in mind Joint connections and excessive deflection in decking provide visual safety checks that can speed up the process of necessary inspections Flush top joint enables flush working platform which reduces potential trip hazards and gaps Not only do 4m vertical and 3 5m horizontal options provide versatility

    Original URL path: http://www.turner-access.co.uk/about-us/case-studies/deepwater-transocean-frontier.aspx (2016-02-12)
    Open archived version from archive

  • Read the Scottish Local Authority Case Study from Turner Access
    its housing and local estates The investment is part of the Council s commitment to bring every Council home in the area up to the Scottish Quality Housing Standard by 2015 Challenges The challenge for Turner Access is to provide versatile safe and quick access to a number of differing property types throughout the Local Authority on time and on budget By using Turner OCTO System Scaffolding Turner Access meets this demand Greater Versatility Greater versatility is achieved through design of key scaffold components ensuring a versatility that provides almost limitless possibilities in scaffold structure size and shape Improved Safety Safety features are designed and manufactured into key Turner OCTO scaffold components everything from how the component is handled and fitted to the system of work that prevents falls from height Increased Productivity For the same scaffold area Turner OCTO uses fewer components and is less than half the weight of traditional Tube Fittings and traditional system scaffolding This means a reduction in erection and dismantling costs and increased speed resulting in greater productivity Turner OCTO is a great improvement on other scaffolds we have used It is quick to assemble the aesthetics of it are unparalleled and the sub

    Original URL path: http://www.turner-access.co.uk/about-us/case-studies/scottish-local-authority.aspx (2016-02-12)
    Open archived version from archive

  • Turner Access Corporate Social Responsibility Snapshots
    much as possible and where packaging cannot be removed completely it is re cycled Plywood purchased for decking is purchased under PEFC certified conditions ensuring that the plywood is sourced and manufactured from sustainable sources Fuel Efficiency At Turner Access tracking systems have been introduced on all vehicles Part of the benefit of this is the ability to report on factors that will affect fuel usage Reduced idling time a

    Original URL path: http://www.turner-access.co.uk/about-us/turner-access-corporate-social-responsibility/snapshots.aspx (2016-02-12)
    Open archived version from archive

  • BetaGuard® Advanced Guardrail System Collective Protection Solution
    Aluminium Towers Assembling and dismantling aluminium towers must comply with the standards set out by the Work at Height Regulations 2005 Hierarchical requirements place collective protection over mitigation options As an advance guardrail system the BetaGuard provides Best Practice Collective Protection but without the Manual Handling problems associated with current Industry practice BetaGuard simplifies tower erection by eliminating the need for both horizontal and diagonal braces reducing the main components to a total of three Utilisation and asset management is achieved with ease as individual single bracing members more susceptible to loss damage and theft are replaced Other benefits of the BetaGuard Advance Guardrail System include its ability to act as a bridging component to bridge towers removing the need for bridging lattice beams Tower erection without trip hazards at base level and a walk in through facility with high clearance is automatically achieved Through creative design the BetaGuard Advance Guardrail System provides Affordable Innovation Achievable Safety and Astounding Simplicity BetaGuard Advance Guardrail System A Safer Way to Build A BETA Way to Build BetaGuard is currently available for use on BETA OCTO and MAST Aluminium Tower types BetaGuard may also be suitable for use on other Towers subject to

    Original URL path: http://www.turner-access.co.uk/products/collective-%28passive%29-fall-protection/betaguard%C2%AE-integral-advance-guardrail.aspx (2016-02-12)
    Open archived version from archive

  • GuardAid® Collective (Passive) Protection Positional Tool
    a scaffolding guardrail before it is fixed and locked into place The GuardAid positional tool provides the scaffolder with integrated safety and safe systems of work throughout scaffold erection dismantle and alteration therefore eliminating the risk of fall from height and enabling compliance with the Work at Height Regulations 2005 GuardAid enables existing components to be utilised as integral advanced guardrails This is achieved by combining a sequence of steps

    Original URL path: http://www.turner-access.co.uk/products/collective-%28passive%29-fall-protection/guardaid%C2%AE-positional-tool.aspx (2016-02-12)
    Open archived version from archive

  • Leonardo Nuovo Powered Access Self Propelled Personnel Lift
    and work at 4 9 metres high Unrivalled Manoeuvrability front wheel steer allows ZERO turning radius Dual Roll Out Decks provide outreach at both ends Low Ground Weight can be used on raised access floors Kingspan approved Super Compact Size allows access through standard doorways and into passenger lifts Direct Electric Drive providing 6 5 miles 12km drive or 250 lift cycles on one charge Locking Steer Wheels make it

    Original URL path: http://www.turner-access.co.uk/products/powered-access/leonardo-nuovo.aspx (2016-02-12)
    Open archived version from archive

web-archive-uk.com, 2016-10-27