  • Gunfleet Sands Offshore Windfarm - VolkerInfra
    substation Facts and figures Type of works Horizontal directional drilling marine cable installation onshore cable installation Client DONG Energy Value 1 4m Duration Seven weeks Roles and responsibilities Main contractor Project categories Trenchless techniques Onshore and offshore windfarms The onshore cable route stretched 5km and involved three horizontal directionally drilled crossings across a railway a river and a site of special scientific interest A temporary 500m safety zone was established around the Gunfleet Sands Wind Farm site during construction When the construction phase was finished both fishing and leisure craft were permitted to pass through the wind farm site This high profile project consists of 48 wind turbines each with a capacity of producing 3 6MW giving a total windfarm capacity of 172MW The rotor diameter of the turbines is 107m with a maximum height of 129m from blade tip to sea level Key challenges Three horizontal directionally drilled crossings Collection of the offshore cable from a factory in Italy Manouvering the pipe to offshore from onshore Weather and tidal conditions Gunfleet sands offshore windfarm Gunfleet Sands Offshore Windfarm Gunfleet Sands Directions void null class even map View project on map Contact VolkerInfra The Lancashire Hub Preston City Park Bluebell

    Original URL path: http://www.volkerinfra.co.uk/en/projects/detail/gunfleet-sands-offshore-windfarm (2016-04-26)
    Open archived version from archive

  • Projects - VolkerInfra
    The windfarm has been developed by Project details Walney Offshore Windfarm Phase 1 Irish Sea DONG Walney UK Limited a wholly owned subsidiary of DONG Energy A S is constructing and building an offshore windfarm with Project details Previous 1 2 Contact VolkerInfra The Lancashire Hub Preston City Park Bluebell Way Preston Lancashire PR2 5PE T 44 0 1772 759 600 F 44 0 1772 708 621 Questions and comments

    Original URL path: http://www.volkerinfra.co.uk/en/projects/p/cat/onshore-and-offshore-windfarms/page/1/ (2016-04-26)
    Open archived version from archive

  • RAF Kinloss Sea Outfalls - VolkerInfra
    base of three squadrons carrying out around the clock surveillance and search and rescue missions over the Atlantic Its 2 3km runway has an area of over 100 000 square metres which during the average year will collect around 65m litres of water All of it needs to be collected carefully cleaned and carried to the deep water channel of the Moray estuary to meet strict EU environmental regulations VolkerInfra s specialist expertise was called on in Summer 2006 by engineering firm AMEC which was committed to installing two underground outfalls to handle the waste water one was to be 484m long and 630mm in diameter and made of polyethylene alone while the other had to be clad in a steel outer sleeve with a diameter of 323mm and a length of 775m The construction was carried out in four stages taking just under three months The pipes were made up from sections on dry land holes were drilled the pipes were towed out to sea and pulled back into the holes and finally special nozzles known as diffusers and protection structures were constructed on the subsea ends Services included In house design and engineering trenchless techniques and marine pipeline

    Original URL path: http://www.volkerinfra.co.uk/en/projects/detail/raf-kinloss-sea-outfalls (2016-04-26)
    Open archived version from archive

  • Sheringham Shoal Offshore Windfarm - VolkerInfra
    the crossing of the primary sea defence by means of 2 Horizontal Directional Drills In each of these drills a HDPE duct was installed with an outside diameter of 560mm PE100 SDR 11 These activities Phase 1 of the project were carried out over the winter of 2009 2010 In addition to Phase 1 VolkerInfra also assisted VSMC during the cable pulls Phase 2 of the project which was executed in autumn 2010 An important issue during the design and construction were the limitations with regards to the permits and allowable working windows For the installation of the ducts the VolkerInfra owned 250 ton drill rig was mobilised as well as the marine vessel MSC Ailsa with a 4 point mooring system and diving facilities including diving tanks The rig was positioned onshore whilst the marine vessel and the divers assisted the drill at the exit point offshore The HDPE ducts were butt welded onshore by VolkerInfra s own team Once a drilling was completed the HDPE duct was pulled into the sea connected to the drilling string ballasted with water and pulled into the borehole The HDD works were carried out during the winter months which led to additional requirements to safeguard the health and safety of our employees Client s representatives and the general public Special care also had to be taken to minimise the lost time owing to frozen equipment Phase 2 of the project was carried out during the autumn of 2010 Once again the weather was extreme for the time of year and precautions had to be taken to ensure the safety of all components of the project For the cable installation the VolkerInfra owned 40 ton pulling winch was mobilised At the offshore side a diving support vessel as well as several other support

    Original URL path: http://www.volkerinfra.co.uk/en/projects/detail/sheringham-shoal-offshore-windfarm (2016-04-26)
    Open archived version from archive

  • Walney Offshore Windfarm Phase 1 - VolkerInfra
    an offshore substation by approximately 6 3km of 33kV internal array cable systems The offshore transformer platform substation will be situated in the middle of the windfarm and will be connected to the 400 132kV Heysham grid substation on shore through approximately 45km of 132kV submarine armoured cable and approximately 2 7km of underground cable Visser Smit Marine Contracting VSMC was awarded the interturbine cable and export cable installation contract VolkerInfra and VSH Marine assisted VSMC with the crossing of the sea defence the pull in of the cable and burial of the cable in the near shore area VolkerInfra installed the cable duct from the onshore joint bay crossing the sea defence up to about 300m on to the tidal flat The 560mm HDPE duct was built up in sections onshore using butt welding technology The sections were then towed onto the tidal flat placed in a pre excavated trench ballasted with concrete mattresses and backfilled One of the complicating factors was the crossing of the Barrow export cable which was in operation The cable was supported and a concrete tunnel was installed underneath the cable in which the PE duct was installed Another challenge was the route of the cable with an almost 90 0 curve Two VolkerInfra owned 40 ton pulling winches were used to pull in the HV cable Prior to the cable pulling the VSMC owned plough was pulled towards the end of the PE duct During the pull the friction of the cable was reduced using special VolkerInfra owned heavy duty cable rollers Although the time schedule was tight VolkerInfra and VSH Marine were able to install the duct and pull the cable with the minimum delay to the cable lay vessel Stemat Spirit Once the cable was pulled in the PE duct was

    Original URL path: http://www.volkerinfra.co.uk/en/projects/detail/walney-offshore-windfarm-phase-1 (2016-04-26)
    Open archived version from archive

  • Successfully unsubscribed - VolkerInfra
    news notifications Contact VolkerInfra The Lancashire Hub Preston City Park Bluebell Way Preston Lancashire PR2 5PE T 44 0 1772 759 600 F 44 0 1772 708 621 Questions and comments Contact us VolkerInfra The Lancashire Hub Directions void null Plan your route here News alerts Enter a valid email address Sign up Service Disclaimer Sitemap Accessibility Follow us Public Liability Portal Compensator QBE Insurance Group Ltd ID C00119 VolkerInfra

    Original URL path: http://www.volkerinfra.co.uk/en/news/successfully-unsubscribed (2016-04-26)
    Open archived version from archive

  • Good result for VolkerWessels annual figures 2014 - VolkerInfra
    an increase of 31 million compared to 2013 Multi year contracts mainly in management and maintenance create a stable foundation for the company s future The liquidity position is also developing well and VolkerWessels has a net positive cash position at the end of 2014 Despite a slight decrease in volume the quality of our order book has improved and remains strong This is due to a good spread of activities combined with a growing number of multi year contracts These contracts generate a stable income flow and are important building blocks for future revenue and results Jan van Rooijen Chief Financial Officer said Our Construction Property Development Netherlands division is still contending with challenging market conditions Although we are seeing tentative signs of a recovery in the lower end of the housing market market conditions remain particularly challenging The Infrastructure Netherlands division is also operating in tough market conditions Reduced budgets at local and provincial level are causing overcapacity This is creating unhealthy pressure on costs with price differences of more than 25 no longer being unusual in public procurement processes Heavy losses in the sector therefore come as no surprise Henry Holterman Supervisory Board Chairman said Because unacceptable risks are still being taken in the construction and infrastructure sector in the Netherlands we expect the issues faced in the sector to persist in the coming years VolkerWessels refuses to be dragged into these unhealthy market trends and prefers to distinguish itself through quality and innovation We are pleased that once again we achieved positive operating results in all divisions This performance is due in part to our willingness to innovate in a sustainable way and make selective investments VolkerWessels focuses on entrepreneurship combined with financial and operational discipline Please click below to read the full press release VolkerWessels

    Original URL path: http://www.volkerinfra.co.uk/en/news/detail/good-result-for-volkerwessels (2016-04-26)
    Open archived version from archive

  • VolkerInfra awarded Burbo Bank onshore cable installation project - VolkerInfra
    combination of open cut trenching and Horizontal Directional Drilling HDD methods to install the cables To minimise disruption to the local community and the general public the developer and contractor have committed to utilise the HDD method of installation on nearly all of the road crossings on the cable route corridor The onshore cable circuit will comprise of three single core 220kV 1000mm 2 cables including fibre optic cables inserted into pre installed power pipe The 400kV circuit from the onshore substation to National Grid s Bodelwyddan substation will comprise of three single 400kV 630mm 2 Al 1000 mm 2 XLPE cables including fibre optic Klaus Skoust Moller senior director for Burbo Bank Extension at DONG Energy said Burbo Bank Extension is an exciting project which will provide power to around 180 000 UK households and we are delighted to appoint VolkerInfra to install the onshore underground cables for this wind farm VolkerInfra has specialist expertise in this area and is based near to the project in Preston DONG Energy is committed to investing in the UK and building a strong UK supply chain and it s great to have VolkerInfra working with us on Burbo Bank Extension Jonathon Humphries managing director of VolkerInfra said We are delighted to be awarded this project and look forward to showcasing our onshore cable installation capabilities and to continuing our long standing working relationship with DONG Energy The current Burbo Bank wind farm is located on the Burbo Flats in Liverpool Bay at the entrance to the River Mersey approximately 6 4km from the Sefton coastline and 7 2km from North Wirral The wind farm comprises of 25 efficient wind turbines to generate up to 90MW megawatts of clean environmentally sustainable electricity for approximately 80 000 homes The new Burbo Bank Extension wind

    Original URL path: http://www.volkerinfra.co.uk/en/news/detail/volkerinfra-awarded-burbo-bank-onshore-cable-installation-project (2016-04-26)